Abstract
Resource levelling techniques aim to minimize the fluctuation from one time period to another in resource usage. Except for small‐sized problems, though, computational optimization procedures are inefficient when solving construction resource levelling problems. Consequently, heuristic and metaheuristic approaches are used to get an acceptable, but not necessarily optimal, solution. A simulated annealing hyperheuristic to generate better‐levelled resource profiles is proposed. Unlike traditional heuristic algorithms, a hyperheuristic operates in the ‘low level’ heuristics domain rather than in the solutions domain. A low level heuristic, on the other hand, works in the current solution neighbourhood. The algorithm has been programmed within a commercial project management software system to improve its performance. The low level heuristics operate on the priority levels that the software uses for resource levelling. An illustrative example and the computational analysis demonstrate the potential of the procedure in solving complex scheduling problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.