Abstract

Assembly line balancing problems with multi-manned workstations usually occur in plants producing high volume products (e.g. automotive industry) in which the size of the product is reasonably large to utilize the multi-manned assembly line configuration. In these kinds of assembly lines, usually there are multi-manned workstations where a group of workers simultaneously performs different operations on the same individual product. However, owing to the high computational complexity, it is quite difficult to achieve an optimal solution to the balancing problem of multi-manned assembly lines with traditional optimization approaches. In this study, a simulated annealing heuristic is proposed for solving assembly line balancing problems with multi-manned workstations. The line efficiency, line length and the smoothness index are considered as the performance criteria. The proposed algorithm is illustrated with a numerical example problem, and its performance is tested on a set of test problems taken from literature. The performance of the proposed algorithm is compared to the existing approaches. Results show that the proposed algorithm performs well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.