Abstract
This paper presents a simplified model for optimizing hydropower scheduling for a small producer with a high degree of flexibility. The approach involves selecting the hours with the highest prices. The power plants run at full capacity all hours of the next days when hourly spot prices are greater than the upper p percentile of the hourly spot prices for the last two years (17 520 hours), and do not run otherwise. The simulations for an eight-year period, 2002-9, show a considerable increase in income. The producer can achieve 19% more income compared with a more naive strategy of generating at peak hours on weekdays. Our simulations also show that an optimal choice of p is a value lower than the load factor of the plants, due to the general increase in prices in the studied period.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.