Abstract

Abstract A common engineering solution for excessive settlement with raft foundation (s) is the use of piles in order to reduce the vertical displacements, in this method, the whole structural load is transferred to the piles. This is an overly cautious approach, and there remains a need to find an optimal design method for a building’s foundations. Such a solution may be the piled raft foundation, which allows a reduction of the number of piles due to the integration of the raft in the bearing capacity of the foundation. The aim of the article is to estimate the contribution of foundation elements such as the raft and the piles in the bearing capacity of a residential building located in Warsaw, where the geological conditions are characterized by organic soil layers, principally of gyttja.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.