Abstract

This paper includes a presentation of a simplified three-dimensional numerical model for the prediction of soil movement induced during tunnel construction using tunnel boring machines (TBM). The model is based upon the generalization of the convergence-confinement concept to 3D tunnel construction. It uses two parameters ( L dec and α dec) which stand for the length of the unlined zone and the partial stress release, respectively. The value of the parameter L dec can be taken equal to the tunnel diameter, while the value of α dec can be determined by fitting the model to empirical formula, and then adjusted based on settlement registered during tunnel construction. The capacity of the model is illustrated through an application to a shallow tunnel in soft soil. The comparison of the numerical results to those suggested by different authors shows good agreement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call