Abstract

The problem of robust DCOPF with the uncertainty from load and renewable power is considered. Intuitively, high load power and low renewable power output tend to increase the cost of controllable generators. Thus in most cases, the worst case of load power takes its upper bound and the worst case of renewable power takes its lower bound. As a result, the number of uncertain variables can be reduced. However, there are also counter-examples where the worst case is the opposite case. To study which uncertain variables can be reduced to deterministic ones, we summarize the connection between locational marginal price (LMP) and the worst case of uncertain variables. A simplification method based on LMP is proposed to reduce the number of uncertain variables. Simulations on 14bus, 118-bus, and 300-bus test systems have demonstrated the effectiveness of the proposed approach in reducing computation time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.