Abstract

ABSTRACT Increased fuel assembly gap due to bowing in commercial light-water reactors (LWRs) has an impact on local pin-power distribution due to increased local moderation. In order to consider the effect of increased assembly gap without explicit consideration of increased gap width, a correction method of cross sections in the gap region is proposed. In this cross section correction method, the average chord length of gap region is preserved to capture the effect of increased gap width. The validity of the present method is confirmed by verification calculations in a single assembly and 5 × 5 assembly geometries using the GENESIS code, which is a transport code based on the method of characteristics.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.