Abstract

A simple empirical time-dependent chart of extension fracture initiation is described. The chart was developed using simple borehole periscope observations within the rib pillars, focusing on monitoring the initiations of extension fracture. Nevertheless, the periscope was conducted time to time for the duration of a month, within brittle homogenous and heterogeneous rock pillars (rib pillar). The chart is suitable for predicting extension fracture initiations and extends of fracturing as time progress, predicting the allowable time to install an effective support system and be able to estimate the stability of the rib pillars within a brittle homogenous and heterogeneous rib pillars in a high stress environment. Two practical application and examples of the chart are described. These are firstly, an alternative way of estimating the rib pillar strength and secondly, predicting the maximum allowable time for an effective support installation along the rib pillar.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.