Abstract

When the system fails, the decision to repair or replace a failed unit may depend on the estimated repair cost. Such an idea is called repair limit replacement policy. The repair limit is a limit on the amount of money which can be spent on the repair of a system. The repair limits thus provide an economic replacement policy. Examines optimal repair‐cost limits for a Weibull‐distributed time to failure and an exponentially distributed repair cost. Derives bounds for the optimal repair cost limit that minimizes the average cost per unit time for repairs and replacement. With those bounds, develops a simple algorithm to obtain the optimal repair‐cost limit. Gives numerical examples to illustrate the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.