Abstract
This paper introduces a simheuristic method to the Project Portfolio Selection Problem, designed to maximize the net present value of the portfolio while considering uncertain costs, schedules, interruptions, and inter-project risk correlations. The novel approach combines techniques from Monte Carlo simulation, critical path analysis, queuing theory, and optimization, integrating baseline schedules, project-level uncertainties, budgetary constraints, and risk correlations in a single model. A computational experiment is conducted on a realistic set of ten candidate projects and validated respect to the deterministic version of the problem, demonstrating its ability to select near optimal portfolio proposals with varying combinations of risk and net present value. The findings highlight the significant impact of factors such as contingency reserve allocation policies, operational interruptions, and project risk correlations on portfolio decisions, constituting a helpful framework for the decision-makers at portfolio level.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.