Abstract

Flexible job shop scheduling problem (FJSP) has been extensively investigated and objectives are often related to time. Energy-related objective should be considered fully in FJSP with the advent of green manufacturing. In this study, FJSP with the minimisation of workload balance and total energy consumption is considered and the conflicting between two objectives is analysed. A shuffled frog-leaping algorithm (SFLA) is proposed based on a three-string coding approach. Population and a non-dominated set are used to construct memeplexes according to tournament selection and the search process of each memeplex is done on its non-dominated member. Extensive experiments are conducted to test the search performance of SFLA and computational results show the conflicting between two objectives of FJSP and the promising advantages of SFLA on the considered FJSP.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.