Abstract
In this paper, a shortest route formulation of simple U-type assembly line balancing (SULB) problem is presented and illustrated on a numerical example. This model is based on the shortest route model developed in [Manage. Sci. 11 (2) (1964) 308.] for the traditional single model assembly line balancing problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.