Abstract

Future space applications include very large elements, whose in orbit configuration cannot be launched in a single flight by the existing launchers. Deployable structures present great advantages in this field, as the mass and volume savings that can be achieved are significant. SENER has carried out, under ESA contract, a study to develop, manufacture and test a deployable Large Truss Structure (LTS), that meets the requirements for the mid-term applications foreseen within the European scenario. This paper presents the design, analysis, manufacturing and test phases of a full scale three-module Engineering Model of the LTS.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.