Abstract

This paper considers a corrugator trim problem for a cardboard boxes manufacturing plant that produces boxes of various sizes servicing known customer demand. We present a suboptimal three-step procedure that minimises both trim waste and setup time cost where setup cost is measured as the loss of production resulting from stock rolls size changes. The procedure leads to the least-cost method of combining customer orders on the corrugator and the optimal roll width to use. The paper concludes by applying the proposed method to derive a lower cost schedule for Unipak, one of the leading manufacturer of cardboard boxes in Lebanon.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.