Abstract

To closely describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model is proposed. Due to the issues of non-convexivity and having infinitely many constraints, instead of applying traditional optimization approaches, a specially designed genetic algorithm with mutation along the negative gradient direction is developed. The proposed algorithm is a combination of the steepest descent method with the stochastic sampling algorithm. Some numerical results are included to show its potential for industrial applications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call