Abstract

For many years, the UC (unit commitment) problem has been solved by complex numerical techniques or intelligent search algorithms, due to nonlinear and complex constraints. Many of the applied algorithms employ random searches, which leads to production of different solutions in different program runs. Priority list-based methods are a way out to this, as they produce robust results during a non-iterative procedure, and without help of trial and error efforts. Nevertheless, they have all proven inefficient. This paper introduces a new approach that generates the solutions using algorithm-specific constraint handling techniques, based on the priority list concept. The solution-making stages include: 1. Minimum up/down time establishment using a probabilistic priority list-oriented selection mechanism, 2. Spinning reserve constraint handling through a deterministic priority list-based process, 3. Power balance handling and a ramp rate modification procedure for generating efficient ramp-constrained solutions. The different steps are designed such that efficient modifications are applied in each step without violating the previously established constraints. Simulation results on different test systems reveal that the approach obtains robust and competitive results. A new 140-unit large-scale test system based on Korean power system is also presented for verifying applicability of the proposed approach on real world power systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.