Abstract

In this paper, two new methods are proposed for solving a seasonal demand problem with variable lead-time and resource constraints. Despite its significance, no study has been done on such problem to obtain the best policy. First, in order to solve the variable lead time, a linear programming relaxation using piecewise linearization techniques is derived. Then, a mixed integer program with linearization techniques is constructed for the seasonal demand problem. Finally, some illustrative examples are included to demonstrate the applicability of the proposed models.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.