Abstract

Abstract In this paper, a production scheduling problem in glass manufacturing is studied. The production facility consists of multiple identical production lines and each production line includes a number of serially arranged machines. The production is characterized by semi-ordered processing times in each product family, and the last machine in each production line is a bottleneck machine. Significant changeover times are required when products of different families are produced on a production line. The scheduling problem was modeled as a parallel no-delay flowshop scheduling problem (PNDFSP). The PNDFSP combines the parallel machine scheduling problem (PMSP) with the no-delay flowshop scheduling problem (NDFSP). While PMSP and NDFSP have received considerable attention in the literature, PNDFSP has not been well studied. A mixed-integer programming formulation is developed and an efficient heuristic algorithm is proposed. The sequential heuristic algorithm considers simultaneously the line changeover...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.