Abstract

PurposeIn the grid‐based simulation, the resource application needed is distributed in the grid environment as grid service, and time management is a key problem in the simulation system. Grid workflow provides convenience for grid user to management and executes grid services. But it emphasizes process and no time‐management, so a temporally constrained grid workflow model is pointed out based on grid flow with temporally constraint to schedule resources and manage time.Design/methodology/approachThe temporally constrained grid workflow model is distributed model: the federate has local temporal constraints and interactive temporal constraints among federates. The problem to manage time is a temporally distributed constraint satisfaction problem given deadline time and duration time of grid services. Multi‐asynchronous weak‐commitment search (AWS) algorithm is an approach to resolve DCSP, so a practical example of a simulation project‐based grid system was presented to introduce application of Multi‐AWS algorithm.FindingsThe temporally constrained grid workflow is based temporal reasoning and grid workflow description about grid services.Originality/valueThe new problem about scheduling resources and managing time in the grid‐based simulation is pointed out; and the approach to resolve the problem is applied into a practical example.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call