Abstract
In factories during production, preventive maintenance (PM) scheduling is an important problem in preventing and predicting the failure of machines, and most other critical tasks. In this paper, we present a new method of PM scheduling in two modes for more precise and better machine maintenance, as pieces must be replaced or be repaired. Because of the importance of this problem, we define multi-objective functions including makespan, PM cost, variance tardiness, and variance cost; we also consider multi-parallel series machines that perform multiple jobs on each machine and an aid, the analytic network process, to weight these objectives and their alternatives. PM scheduling is an NP-hard problem, so we use a dynamic genetic algorithm (GA) (the probability of mutation and crossover is changed through the main GA) to solve our algorithm and present another heuristic model (particle swarm optimization) algorithm against which to compare the GA’s answer. At the end, a numerical example shows that the presented method is very useful in implementing and maintaining machines and devices.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The International Journal of Advanced Manufacturing Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.