Abstract

In this paper, we propose a time-constrained scheduling approach to minimize resource cost. Most previous approaches cannot estimate resource costs completely in the initial scheduling process, because most operations have not been assigned yet. Therefore, our approach eliminates the operation and control step pair with the maximum resource cost. In order to minimize total resource cost, we also estimate the resource cost of functional units, registers, and buses based on the distribution of operations. © 1999 Scripta Technica, Electron Comm Jpn Pt 2, 82(1): 34–42, 1999

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.