Abstract

In this chapter, a scatter search (SS) method is proposed to solve the multiobjective permutation fuzzy flow shop scheduling problem. The objectives are minimizing the average tardiness and the number of tardy jobs. The developed scatter search method is tested on real-world data collected at an engine piston manufacturing company. Using the proposed SS algorithm, the best set of parameters is used to obtain the optimal or near optimal solutions of multiobjective fuzzy flow shop scheduling problem in the shortest time. These parameters are determined by full factorial design of experiments (DOE). The feasibility and effectiveness of the proposed scatter search method is demonstrated by comparing it with the hybrid genetic algorithm (HGA).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.