Abstract

Refurbished products are gaining importance in many industrial sectors, specifically high-value products whose residual value is relevant and guarantee the economic viability of the re-manufacturing at an industrial level, e.g., turbine blades for power generation. In this paper, we address the robust scheduling scheme of re-manufacturing activities for turbine blades. Parts entering the process may have very different wear states or presence of defects. Thus, the repair process is affected by a significant degree of uncertainty. The paper investigates the uncertainties and discusses how they affect the scheduling performance of the re-manufacturing system. We then present a robust scheduling framework for the re-manufacturing scheduling strategies, policies, and methods. This framework is based on a wide variety of experimental and practical approaches in the re-manufacturing scheduling area, which will be a guideline for the planning and scheduling of re-manufacturing activities of turbine blades. A case study approach was adopted to examine how re-manufacturers design their scheduling strategies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.