Abstract

The large magnitude of supply/ground bounces, which arise from power mode transitions in power gating structures, may cause spurious transitions in a circuit. This can result in wrong values being latched in the circuit registers. We propose a design methodology for limiting the maximum value of the supply/ground currents to a user-specified threshold level while minimizing the wake up (sleep to active mode transition) time. In addition to controlling the sudden discharge of the accumulated charge in the intermediate nodes of the circuit through the sleep transistors during the wake up transition, we can eliminate short circuit current and spurious switching activity during this time. This is, in turn, achieved by reducing the amount of charge that must be removed from the intermediate nodes of the circuit and by turning on different parts of the circuit in a way that causes a uniform distribution of current over the wake up time. Simulation results show that, compared to existing wakeup scheduling methods, the proposed techniques result in a 1-2 orders of magnitude improvement in the product of the maximum ground current and the wake up time

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.