Abstract

Inaccurate price prediction may cause improper charging/discharging schedules of battery energy storage (BES) in electricity market, which further leads to less or even negative market profits of BES. On this condition, uncertainty in market prices should be fully considered when making operation strategies. In this paper, focusing on an independently operated BES in day-ahead and hour-ahead markets, a multi-stage robust optimal operation strategy is formulated considering uncertainty in multi-periods market prices. The robust optimization model is formulated seeking to maximize market revenues of BES within a given confidence level of price deviation. The max-min model can be converted into a mixed-integer linear programming (MILP) problem which can be easily computable. Case study results demonstrated the validity of the presented robust operation strategy of BES.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.