Abstract

To minimize the total workload delayed in the terminal yard, an integrated model of yard space allocation and crane scheduling is proposed. To deal with the uncertainty in pick-up process of import containers, a robust optimization model is suggested to simultaneously determine the storage locations of import containers and the routes of yard crane movements. A Lagrange relaxation algorithm and a modified method are proposed. Numerical experiments show that the proposed approach meets the requirement of practical applications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call