Abstract
Multi-skill resource-constrained project scheduling problem (MS-RCPSP) is one of the most investigated problems in operations research. Most researches ignore transfer time of resources between activities, which is regularly en-countered in manufacturing and service industries. Traditional methods assume that the skill value of resource is fixed, but in practice, it changes with the influence of the environment. When using traditional approach, the optimizing procedure of the baseline project plan fails and leads to delays. To address this issue, we propose a robust model which employs a novel robust counterpart that is different from the previous literature. A new genetic algorithm using two new population initialization heuristic methods is proposed to find a robust schedule. Experiment shows the effectiveness of our proposed method in providing more robust schedules under resource skill uncertainty.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.