Abstract

It is well known that the communication delay due to the phasor measurement in wide area monitoring system (WAMS) as well as various system operating conditions such as heavy line flows and unpredictable network structures, may deteriorate the wide-area stabilizing control effect. To overcome this problem, the inverse input and output multiplicative model is proposed to represent unstructured uncertainties due to system operations and communication delay in the robust centralized damping controller design of superconducting magnetic energy storage (SMES) based on WAMS. The structure of centralized controller for SMES is the practical 1st-order lead/lag compensator. To automatically tune the control parameters, the optimization problem based on the enhancement of damping performance and system robust stability margin is achieved by particle swarm optimization. Simulation studies in the West Japan six-area interconnected system confirm that the proposed robust SMES centralized controller is superior to the conventional SMES centralized controller in terms of damping performance and robustness against system and time delay uncertainties.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.