Abstract

The China fusion engineering test reactor (CFETR) is an ITER-like tokamak system for fusion energy development. It could output 50-200 MW fusion power in phase I for demonstrating power generation with complete structure of fusion power plant, and 1 GW output power can be expected in phase II. Its ITER-like HV substation receives power from the 500 kV transmission grid for powering its pulsed power electric network (PPEN) and steady-state electric power network (SSEN). This paper describes the concept design of the electric power system, with emphasis on its turbine generator implemented with flexible doubly fed induction generator (DFIG). DFIG has ride through ability during the plasma-off period. Its capability diagram is configured to analyze its operation range. Similar to ITER, the CFETR also requires about 1 GVar reactive power to be compensated. Based on this requirement, the generator is expected to generate part of reactive power to compensate and stabilize the local power network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call