This paper presents development of a scheduling methodology for module processing in thin film transistor liquid crystal display (TFT-LCD) manufacturing. The problem is a parallel machine scheduling problem with rework probabilities, sequence-dependent setup times and due dates. It is assumed that rework probability for each job on a machine can be given through historical data acquisition. The dispatching algorithm named GRPD (greedy rework probability with due-dates) is proposed in this paper focusing on the rework processes. The performance of GRPD is measured by the six diagnostic indicators. A large number of test problems are randomly generated to evaluate the performance of the proposed algorithm. Computational results show that the proposed algorithm is significantly superior to existing dispatching algorithms for the test problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.