Abstract
India is a developing country; the population of India is growing exponentially. India ranks 2nd in the world in terms of population. As there will be a gradual increase in population there will be an increase in the number of vehicles, as a result of which traffic congestion is increasing and as a result, emergency vehicles such as ambulances, fire-fighters, etc. are having difficulty getting to their destination on time. Vehicle use is growing rapidly due to recent technological and economic developments, and at the same time, the lack of infrastructure against demand is leading to an increase in the number of accidents and fatalities. Minor problems in our health system have prompted us to come up with a petition to make this process work and save lives. Through book reviews and reflections, I have proposed a project in a smart traffic management system using image processing. The aim of this project is to improve simulation to determine traffic congestion, to detect a crash/accident, and to obtain an ambulance using image processing and machine learning techniques. The proposed independent work is simulated in the form of an experimental setup using Arduino and LED displays that mimic real-time traffic. These simulation results reflect the terms of the acquisition as it provides an emergency vehicle pass to catch up on peak hours.
Highlights
Population in developing countries such as India is increasing significantly
Traffic congestion is often commonly associated with some other traffic issues, such as the blocking of emergency vehicles
The traffic congestion often blocks the path of the emergency vehicles which may Human Life is a very valuable thing for any country
Summary
Population in developing countries such as India is increasing significantly. This result in a number of problems such as heavy traffic jams, violation of the traffic rules and sometimes even accidents. The traffic congestion often blocks the path of the emergency vehicles which may Human Life is a very valuable thing for any country. In recent times the number of deaths due to delays in the arrival of emergency vehicle has risen to greater extent. Emergency services such as ambulances and fire engines must be on time to avoid loss of human life. The main purpose of this device is to allow the ambulance to reach a specific location without making it stop somewhere before it reaches the destination
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Informatics Electrical and Electronics Engineering (JIEEE)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.