Abstract

Entirely grouted cable tendons are commonly used in mining engineering. They have superior working ability in reinforcing the excavated rocks and soils. During the working process of cable tendons, the force-transferring ability and the corresponding mechanism are significant in guaranteeing the safety of underground openings. To further understand the force-transferring mechanism of entirely grouted cable tendons, this paper provided a literature review on the force transfer of cable tendons. First, the force-transferring concept of entirely grouted cable tendons was summarised. The force-transferring process and failure modes of cable tendons were illustrated. Then, the experimental test program used in testing the entirely grouted cable tendons was summarised. The advantages and disadvantages of various test programs were illustrated. After that, the working ability of entirely grouted cable tendons was reviewed. The effect of various parameters on the working ability of cable tendons was summarised and compared. These parameters include the rock stiffness, embedment length, cement grout property, resin grout property, modified geometry, borehole size, rotation and pre-tensioning. Last, a discussion was provided to elaborate the working ability and force-transferring mechanism of entirely grouted cable bolts. This literature review is beneficial for researchers and engineers, furthering their understanding of the working ability of cable tendons.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call