Abstract
AbstractPrefabricated buildings have the characteristics of high work efficiency, high economic benefits, good safety, low resource consumption, energy saving and environmental protection, and their development has brought great progress to the construction of industrial buildings in my country. However, during the construction process, there are some problems, such as the chaotic production process and the time-consuming transportation process, which need to be better solved. Facing these problems, many scholars have adopted a variety of optimization algorithms to solve them. The purpose of this research is to analyze the application of the current optimization algorithm in the prefabricated building construction stage and summarize its application defects. Based on a detailed analysis of the existing literature, this paper comprehensively reviews the application of optimization algorithms in the production of prefabricated components, the transportation of prefabricated components, and the on-site installation of prefabricated components. On the basis of analysis and review, this article summarizes the inaccurate calculation results of the optimization algorithm in the field of prefabricated building construction, and the calculation time is too long, and provides relevant suggestions for future potential research.KeywordsOptimization algorithmPrefabricated buildingComponent transportationCrane planning
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.