Abstract

Abstract The operational performance of the JET neutral beam injector (NBI) system during 2003 is presented and compared with NBI operation from 1994 to 2002. The paper also addresses different demands imposed on NBI operation during the JET Joint Undertaking (until the end of 1999) and the European Fusion Development Agreement (EFDA) JET operating contract (from 2000). The material presented shows new operational performance records achieved in 2003, derived from data focused on average and maximum pulse lengths, pulse power and injected pulse energy. Over the last 10 years, the issue of JET NBI positive ion neutral injector (PINI) reliability and availability has also been of significant interest. A discussion is presented where terminology is defined, technical systems causing unreliability and non-availability are analysed and operational practices are reviewed. The performance analysis shows that during the period of JET operation under the EFDA contract, the NBI facility has successfully changed from high power-short pulse to high power-long pulse (10 s) operation. It also shows that the sources of unreliability and non-availability have largely remained constant during this change.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.