Abstract
During the early days of New China (1950—1957), a relatively complete flood control, drainage,and irrigation system in the Huai River was established by the central government without adequate engineering-hardware and engineering-software, including financial and material resources as well as technology and equipment. In this process, the engineering orgware factors, including the engineering concept of "the balance of flood storage and drainage" , engineering organization mode of "pool resources to address major problems" , and engineering values of "people-centered" , offset the weaknesses of engineering-hardware and engineering-software. Under the background of major change that is rarely seen in a century and the modernization of China’s governance system and capacity, by digging into the decision-making and implementation process of the Project of Huai River Management in that era, the positive functions of engineering-orgware can be examined to clarify which are helpful to accurately grasp the historical mission and significance of engineering construction and development in the New Era.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.