Abstract

In the last decade, the EU has driven forward the development and connection of renewable power sources across Europe. This has changed the way in which distribution networks operate, moving from a passive system, to a more active system where generation and demand are located closer together with system states being more complex and variable. Increased penetration of renewable generation into distribution networks is presenting a number of challenges to Distribution Network Operators (DNOs) including the provision of network access in capacity constrained networks. The introduction of Active Network Management (ANM) is enabling an increase in renewable generation connections through enhanced network access in otherwise ‘full’ networks.This paper presents a way in which DNOs might move towards Business as Usual (BAU) arrangements for ANM schemes. It is necessary to determine the curtailment arrangements, or Principles of Access (PoA), and from this estimate generation access under ANM and the flow of services and money for different scenarios. In this paper, a comprehensive literature review, detailed case study evaluation on early ANM schemes, quantitative curtailment assessment for different PoA and a qualitative analysis of business models for different ANM PoA is presented in turn with conclusions drawn from these three approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.