Abstract

This paper reviews the pricing of high-occupancy toll (HOT) lanes and finds that 1) existing dynamic pricing adjusts every 3-15 minutes according to such parameters as speed, density, and/or volume, 2) tolls increase progressively with traffic to ensure free flow HOT lanes, 3) for multi-zone HOT lanes, tolls tend to be determined by the most congested zone, 4) the reaction of motorists to toll adjustments is either unspecified or oversimplified, and 5) a toll boundary is essential to mediate extreme fluctuations. Based on values of time savings and reliability, a novel toll scheme was proposed as a function of speed of general-purpose lanes; tolls in a selected 10-mile HOT corridor varied between $0.77 and $12.64 per use, of which the value of reliability accounted for 24% to 44% while that of time savings accounted for the remainder. The proposed toll scheme can be applied to time-of-day or dynamic HOT pricing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.