Abstract

Due to the wide construction of wind power and the difficulty for it to join the power grid, a short-term hydro-wind economic dispatch (WHED) problem is proposed. WHED system contains several wind power units and hydropower plants, which are renewable and clean. Combined with hydropower plants, the wind power units can join the power grid stably. Then, a WHED system with four cascaded hydropower plants and two wind units is established, and a modified differential evolution (DE) algorithm with chaotic perturbation is proposed for optimizing. Finally, two cases are simulated and analysed, the dispatch results show that the presented model and algorithm are feasible and effective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.