Abstract

Arizona Public Service Company’s Cholla Power Plant has four units with circulating water lines made of 66 in. to 72 in. diameter prestressed concrete cylinder pipe (PCCP) in Units 2, 3, and 4. PCCP in these three units has been in service for thirty-four to thirty-seven years. Inspections over the years have shown a high level of distress throughout the pipelines due to widespread corrosion of prestressing wires. A condition assessment and repair program has been developed and performed over multiple outages with the goal of minimizing the risk of failure of the pipeline and avoiding unscheduled shut down. This paper presents a unique condition assessment and repair program implemented over the past six years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.