Abstract

The cost of producing electric power over a specified study horizon is a random quantity influenced by random failures and repair times for the generating units and variations in demand over time. Previous approaches for determining the variance of the production cost have required implicit or explicit enumeration of a large set of availability or capacity states for the generation system. In this paper, a simplifying assumption makes possible a renewal reward model for the production cost. Formulas are provided to estimate the asymptotic variance for intermediate to long study horizons and their results are illustrated with a numerical example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.