Abstract
The main purpose of this paper is to study the reliability due to the employment of distributed generations (DG) integrated to distribution system. The system under this study is from Provincial Electricity Authority (PEA) that is a part of Thailand’s distribution system. Data of geographic information systems (GIS) including the distance of distribution line and location of load that are parameter of PEA is simulated using digital simulation and electrical network calculation program (DIgSILENT) to analyze the impact of reliability with the installing DG into the distribution system. The system average interruption frequency index (SAIFI), the system average interruption duration index (SAIDI) and interruption cost are assessed as index of reliability by comparing the SAIFI, SAIDI, and interruption cost between the base case (no DG) and the case that DG connected to the distribution system. The results can be summarized by focusing on location of DG, the capacity of DG, the size of load, and the distance of load which are factors able to impact to SAIFI, SAIDI, and interruption cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Energy and Power Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.