Abstract

Reliability centered maintenance (RCM) incorporates sound guidance for managers who wish to attain high standards of maintenance at their operating plants. Since the amount and type of maintenance which is applied depend strongly on the machine or components age (DFR, CFR or IFR), on its replacement cost as well as on the cost and safety consequences of system failure, a careful analysis of the system components based on their reliability data should be done in order to optimize the maintenance program. This paper describes the methodology which was used at an aluminum plant in order to select critical machines and to develop an optimal maintenance policy based on reliability data of each machine, safety consequences of system failure, lead time and repair time, and components criticality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.