Abstract

A reinforcement learning-driven brain storm optimisation idea (RLBSO) is proposed in this paper to solve multi-objective energy-efficient distributed assembly no-wait flow shop scheduling problem. The objectives of the problem include minimising the maximum assembly completion time (), minimising the total energy consumption (TEC) and achieving resource allocation balanced . Four operations, which are critical factory insert, critical factory swap, critical factory insert to other factories, critical factory swap with other factories, are designed to optimise the objective of maximum assembly completion time. Q-learning mechanism is utilised to guide the selection of operations to avoid blind search in the iteration process. The learning mechanism based on clustering mechanism in brain storm optimisation algorithm is utilised to assign products to factories in the objective space according to the processing time of products to balance the resources allocation. The speed of operations on non-critical path is slowed down to reduce TEC regarded with the characteristics of no-wait flow shop scheduling problem. The experimental results under 810 large-scale instances by RLBSO show that the RLBSO outperforms the comparison algorithm for addressing the problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.