Abstract

Ever since the first nuclear power plant was built in Korea in 1977, the electricity produced by nuclear power plants has increased rapidly. It has been required that the spent nuclear fuel from nuclear power plants be managed safely. Therefore, technology for this purpose must also be developed. The Korea Atomic Energy Research Institute has developed the devices to manage these spent nuclear fuels. Due to high radiation levels, all these devices must be operated in a hot cell, which is a heavily shielded sealed room. Since these devices must be highly reliable, real-time monitoring is necessary to check that they are working correctly. A real-time three-dimensional graphic simulator is proposed to monitor the spent nuclear fuel dismantlement devices through the Internet. In order to reduce the visualization time of the devices, the abstraction of graphics data is performed. Also, simple operational information from a large number of sensors is extracted, and an efficient message format and its communication scheme are defined to reduce the communication time over the Internet.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.