Abstract

In the railway station scheduling system under the water-rail combined transport mode, how to reasonably allocate equipment resources according to the operation tasks, improve the efficiency of mechanical loading and unloading, and reduce the cost of loading and unloading operations, has become an urgent problem in the process of building a modern port. In this paper, a railway station scheduling algorithm based on multi-objective particle swarm optimization algorithm (RSSAMOPSO) was designed. The multi-objective particle swarm algorithm was used to solve the multi-objective optimization problem of railway station scheduling. Aiming at the problems of decreasing con-vergence speed and the lost of the diversity of the solutions, a compression factor and an adaptive mutation operator are introduced. The improved multi-objective particle swarm algorithm (IM_MOPSO) is combined with the compression factor and adaptive mutation operator to obtain the optimal operation sequence and various equipment task allocation schemes. Experimental results show that the above method has a large practical significance and practical value for improving the efficiency of mechanical loading and unloading in the railway yard and reducing the operating cost of the railway yard.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call