Abstract

We develop an open queueing network model for rapid performance analysis of semiconductor manufacturing facilities. While the use of queueing models for performance evaluation of manufacturing systems is not new, our approach differs from others in the detailed ways in which we model the different tool groups found in semiconductor wafer fabrication, as well as the way in which we characterize the effect of rework and scrap on wafer lot sizes. As an application of the model, we describe a method for performing tool planning for semiconductor lines. The method is based on a marginal allocation procedure which uses performance estimates from the queueing network model to determine the number of tools needed to achieve a target cycle time, with the objective being to minimize overall equipment cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.