Abstract

‘Completion in time’ is a crucial element of project management. Previous studies show that earned value management (EVM), earned schedule method, or earned duration management do not give an accurate project completion time estimation (PCTE) because of theoretical weaknesses. Inaccurate PCTE may provide misleading information, so that the project manager cannot take effective schedule control actions timely, and thus it results in failure of project time management. To improve the above-mentioned problem, this research proposes a quantity-based project duration estimating method (Q-PDEM), which calculates the PCTE using the de facto work quantities and the updated productivity information of activities. The results of two case studies show that the proposed Q-PDEM gives a 7.55% better mean absolute percentage error (MAPE) than the existing methods for predicted project completion duration for Case I, and 24.54% for Case II. It is concluded that the proposed Q-PDEM gives a more accurate estimation of the time for project completion and allows more effective control of the project schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.