Abstract

The investigation reported forms part of a wider study into the applicability of design for manufacture (DFM) thinking to the total construction process, and the ways in which this could be implemented. Historical data from change order request procedures were examined for several case studies which were considered to be successful projects. These procedures are intended to capture information about design modifications, and thus can be considered to be analogous to the rework procedures used in manufacturing. It was found that in monetary terms alone, the direct cost of post contract design changes amounts to 5.1-7.6% of the total project cost. Although the case studies used here were a convenience sample, the typical financial opportunity for controlling design changes better is likely to be considerably greater than this. Frequently cited reasons for design changes included: employer has changed his requirements, designer's omission in tender documents and new information on existing site conditions. Little commonality between case studies was found at the work package level. In contrast to manufacturing, the availability and accessibility of data relating to rework is problematic.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.