Abstract
New energy aircraft is a trend of aircraft development in the future. More and more countries and enterprises have carried out relevant research. This article summarizes the characteristics of the civil aircraft program life cycle development and combining with the technical characteristics of new energy aircraft, this risk management method based on RBS is proposed. Through analytic hierarchy process (AHP), quantitative assessment of the total risk of the project, this method can comprehensively quantitatively identify the typical risks in the whole life cycle, provide a feasible method for risk management of the new energy civil aircraft project.
Highlights
With the rapid development of aviation industry, a series of problems such as energy crisis and environmental pollution are highlighted
The development of new energy aircraft is the fundamental measure to solve the problem of pollution and energy consumption, as shown in Figure 1 below
By summarizing the characteristics of new energy civil aircraft program life cycle development and combining with the technical characteristics of new energy aircraft, this paper puts forward a set of risk management method based on risk breakdown structure (RBS), which can efficiently and quantitatively assess all kinds of risks existing in the process of new energy aircraft development
Summary
With the rapid development of aviation industry, a series of problems such as energy crisis and environmental pollution are highlighted. The development of new energy aircraft is the fundamental measure to solve the problem of pollution and energy consumption, as shown in Figure 1 below. Due to the high technical complexity, large investment scale, long development cycle and other significant characteristics of commercial aircraft program, new energy aircraft program has many risk sources and complex nature, and various factors highly cross and interact with each other, which makes risk management and control difficult. By summarizing the characteristics of new energy civil aircraft program life cycle development and combining with the technical characteristics of new energy aircraft, this paper puts forward a set of risk management method based on RBS, which can efficiently and quantitatively assess all kinds of risks existing in the process of new energy aircraft development
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have