Abstract
Abstract A heuristic for design of plantwide control strategies is introduced and applied to the millwide control of a previously presented pulp mill benchmark. Two control strategies (decentralized control and unit-based model predictive control) are compared according to their capacity to reduce the total error and maximize the operating profits. The control strategies are studied through closed-loop simulations of the process including several disturbances and setpoint changes in the digester, oxygen reactor, bleach plant, recausticizing plant and lime kiln.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have