Abstract

Abstract A heuristic for design of plantwide control strategies is introduced and applied to the millwide control of a previously presented pulp mill benchmark. Two control strategies (decentralized control and unit-based model predictive control) are compared according to their capacity to reduce the total error and maximize the operating profits. The control strategies are studied through closed-loop simulations of the process including several disturbances and setpoint changes in the digester, oxygen reactor, bleach plant, recausticizing plant and lime kiln.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call